PORSCHE TEST

EXPERIENCE

Demolition, Abatement, & Earthwork

19800 S. MAIN STREET

CARSON, CA 90745

PERFORMANCE PERIOD:

May 2013- July 2016

CONTRACT VALUE:  $13,800,000

C L I E N T

Watson Land Company & Porsche Cars North America

R E F E R E N C E

Chris Trujillo 310.952.6432

Project Scope:

Demolish driving range infrastructure and buildings. Removal of underground transite pipe and other miscellaneous structures. Import 500,000 CY of material and fill to a total cover depth of 6’. Install DTSC-approved landfill cap, which included GCL membrane/HDPE landfill membrane, to protect the test track and the Porsche Experience Center for years to come. Installation of HDPE methane gas collection system throughout the site. Construction manage and perform contractor assist work for piling excavation, foundation, utility installation and paving trades. Mass grade and finish grade for test track +/- .10

Means and Methods:

AMPCO employed its large fleet of excavators for the demolition and hazardous soil remediation and removals. Then 657 scrapers and D9 bull dozers were used to fill, compact and mass grade the entire site. Dozers, blades and other equipment were utilized to finish grade and build the test track.

Challenges Faced:

Navigating the design changes were significant. Porsche North America changed designs nearly every month to create the most forward-thinking test track in the world. Every design change affected the landfill cap, which in turn required the approval of all the lead agencies, including DTSC- AQMD- County of L.A and the City of Carson. AMPCO played a vital role in expediting the approval process and implementing the change orders.

Social media & sharing icons powered by UltimatelySocial
FACEBOOK
YOUTUBE
LINKEDIN
INSTAGRAM