KINCAID PIT

Mass Excavation/Export

6600 N. IRWINDALE AVE,

IRWINDALE, CA 91702

PERFORMANCE PERIOD:

Jun 2019 – June 2020

CONTRACT VALUE:  $2,800,000

C L I E N T

United Rock Inc.

R E F E R E N C E

Matt Mallory 626.357.9508

Project Scope:

Throughout this ongoing project we have an eighty-foot cut through cobble, and export 6,000 tons of material per shift, while maintaining a one-to-one slope.

Means and Methods:

On Site we utilize and operate 850 Excavators, D-9 & D-10 Dozers and 6,000 Gallon water trucks to break down rock, then move and export materials via a group of streamlined haulers. Due to restrictions, we conduct this process throughout an evening shift, where our team safely orchestrates the entire process efficiently and maintains daily production goals.

On site, we utilize and operate 850 Excavators with various attachments, D-9 & D-10 Dozers, and 6,000-gallon water trucks.

Throughout the process we are able to maintain an extremely efficient load rate, which keeps the convoy of import and export haulers moving through the site without delay.

Challenges Faced:

We keep and maintain grade while exporting material with a 185,000-pound excavator. The entire site is monitored 24 hours with G.P.S., Video and Load Tracking to ensure the schedule is constantly maintained.

Social media & sharing icons powered by UltimatelySocial
FACEBOOK
YOUTUBE
LINKEDIN
INSTAGRAM